Installation and Start-up
Copyright
2001 Phone: (614) 771-2718 RE-ACM
Vanner Inc. FAX: 614-771-4904 Owners/Installation Manual
4282 Reynolds Dr. www.vanner.com Rev 0.1a
Hilliard Ohio 43026 RE-ACM-Owners_Man_R01a.doc
17
INCORPORATED
INCORPORATEDINCORPORATED
INCORPORATED
5.2 AC Utility/Load Wiring Installation Procedure
WARNING
Before proceeding with the AC wiring, verify that the inverter is OFF
and that the inverter is NOT connected to the battery. Serious or fatal
electrical shock may occur.
Note:
It is recommended that all AC wiring be done with 10 AWG 90ºC wire. Make certain that
the wiring conforms to National and Local Electric Codes.
F 6 Figure 5.2-1 ACM Schematic
Inverter
Bypass
Inverter
Bypass
Main AC
Disconnect
Inverter
N
IN
OUT
INOUT
To
AC Loads
Neutral
Utility
Meter
L1 L2
N
L1 L2
AC Control /
Distribution Module
Generator
L1 N L2
StartRun
Inverter Control
AC Source
Transfer Relay
AutomaticManual
Utility Generator
Optional Components
Generator Option Only
Note